
A full renovation without the trade juggling
One agreed project scope
We define the preparation, products and fitting before the first unit comes out.
Trades in the right order
We plan each stage so finished surfaces aren't undone by work that came too late.

Turn the whole room into a working kitchen
A complete kitchen renovation deals with more than cabinets and doors. We can remove the old kitchen, alter the layout and coordinate building work, plumbing, electrics, plastering, tiling, appliances and final installation. This joined-up approach suits rooms where worn surfaces, poor storage or badly placed services need proper attention. We first establish what can stay, what must move and how you want to use the finished space. Room size, unit count, structural changes, appliance requirements and worktop choice all affect the scope. Our quotation sets out the agreed specification before the room is stripped back.
A clear sequence keeps work moving
Removal and room preparation come first, followed by structural alterations and first-fix plumbing or electrical work where required. Plastering, floor preparation and tiling then create sound surfaces for the kitchen installation. We fit the cabinetry and bring in worktops, appliances and final connections at the appropriate stage. One documented all-trades project was completed in three weeks, showing what planned coordination can achieve. Complete kitchens start from £7,000 per booking, with the final price reflecting room preparation, chosen products and the amount of trade work involved.

Frequently asked questions
What does a complete kitchen renovation include?
We agree the scope for your room before quoting. It may cover strip-out, structural changes, plumbing, electrics, plastering, tiling, cabinetry, worktops, appliances and finishing. You can see which stages are included before work begins.
Does every complete kitchen cost at least £7,000?
Our published starting price is £7,000 per booking. The final quotation depends on the room, unit count, selected cabinetry, worktops, appliances and preparation required. Structural alterations or moved services can add to the scope.
How long will the renovation take?
Timing depends on the amount of preparation, structural work and chosen products. We completed one documented all-trades renovation in three weeks, but we assess each project separately and plan the sequence around its actual requirements.
